150kV kabelverbinding Halsteren – Zierikzee

Project: HV cable- and energy systems, HV kabel- en energiesystemen
Client: TenneT TSO BV
Location: Zeeland
Year: 2022 - 2024

Project description:

TenneT is going to build a new 380/150 kV high-voltage substation near Halsteren. This will be connected to the new 150kV substation near Zierikzee via an underground cable. The project will connect the region Schouwen-Duiveland to the national high-voltage grid. As a result, the network in the region is more reliable and the capacity is expanding considerably, providing  connection of new sustainable initiatives.

The 150 kV cable route is approximately 30 km. In addition, the Mastgat is crossed by means of a horizontal directional drilling of 2800m, a first for TenneT and the Netherlands.

Activities of Energy Solutions:

Energy Solutions provides expertise in the field of underground high-voltage cables for this project. In collaboration with the TenneT project team, the following aspects are realized:

  • Drafrting a technical basic design for the 150 kV cable connection
  • Preparation of the tender documents for the cable supply
  • Preparation of tender documents for civil works
  • Technical support and consultance during the tender