Dutch English

Solar park Overbetuwe

Project: Solar energy
Client: ProfiNRG, Sunvest
Location: Overbetuwe
Year: 2022 - 2025

Project description:

The Overbetuwe solar farm has been built on a 60-hectare site between the A15 highway and the Betuweroute railway. With an installed power of 86 MWp, the solar park generates 80,000 MWh per year, equivalent to approximately 30,000 households.

Activities of Energy Solutions:

Energy Solutions was involved in the following project phases on behalf of Sunvest and PofiNRG:

  • Basic design for the medium-voltage cables and cable route
  • NEN3654 influence study
  • Electrical engineering support and quality assurance during project excecution
  • Grid compliance study
  • Support during grid compliance testing

 

Interesting websites:

Zonnepark Overbetuwe  ProfiNRG

Zonnepark Overbetuwe Sunvest