After a construction period of 15 months at Bladt Industries A/S in Denmark, the Offshore High Voltage Substation for the Nobelwind wind farm was transported towards the concession zone in Belgium and successfully installed. The 980t substation is located 47km offshore and will collect and transform 165MW of wind energy. Energy Solutions has assisted Parkwind N.V., being the developer of the Nobelwind wind farm, on the electrical engineering and construction management of this OHVS.

img-20160912-wa0011img-20160926-wa0003img-20160925-wa0012